Solar power plant · Yuma, AZ
Agua Caliente Solar Project
Agua Caliente Solar Project is a 348 MW solar power plant in Yuma County, Arizona, operated by Agua Caliente Solar. Its oldest generator still running came online in 2012. In 2025 it generated 547 GWh, about what 44,000 average Arizona homes use in a year.
Agua Caliente Solar Project in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 8th largest, about 3.5% of the state's 9.9 GW of solar capacity.
Yuma County has 13 power plants of 1 MW or more with 2.4 GW in all; Agua Caliente Solar Project is 15% of that and the 2nd largest of 7 solar plants there.
Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Agua Caliente Solar Project (outlined) and other plants in Yuma County, shaded. 32.977, -113.495.
Plant facts
- Operator
- Agua Caliente Solar
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Yuma County, AZ
- EIA plant ID
- 57373
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AGU2 | Solar Photovoltaic | 136 MW | 2012 | – |
| AGU3 | Solar Photovoltaic | 121 MW | 2014 | – |
| AGU1 | Solar Photovoltaic | 91 MW | 2012 | – |
Questions
Agua Caliente Solar Project, answered
How much power does Agua Caliente Solar Project produce?
Agua Caliente Solar Project has 348 MW of capacity from 3 generators. In 2025 it generated 547 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does Agua Caliente Solar Project power?
Its 2025 output of 547 GWh equals the yearly electricity use of about 44,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Agua Caliente Solar Project?
Agua Caliente Solar Project is in Yuma County, Arizona, at about 32.977°, -113.495°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Agua Caliente Solar Project?
It is operated by Agua Caliente Solar (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Agua Caliente Solar Project open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.