Storage power plant · Yuma, AZ

McFarland C

McFarland C is a 185 MW storage power plant in Yuma County, Arizona, operated by AES Clean Energy. Its oldest generator still running came online in 2025.

Capacity185 MWNameplate, September 2026
Net energy-12.0 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

McFarland C in context

Among the 41 storage plants in Arizona in the EIA's inventory, it is the 15th largest, about 2.9% of the state's 6.3 GW of storage capacity.

Yuma County has 13 power plants of 1 MW or more with 2.4 GW in all; McFarland C is 8% of that and the largest of 4 storage plants there.

The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.

Where it is

McFarland C (outlined) and other plants in Yuma County, shaded. 32.946, -113.492.

Plant facts

Operator
AES Clean Energy
Sector
IPP Non-CHP
Grid operator
CISO
County
Yuma County, AZ
EIA plant ID
67498
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MCFRC Batteries 185 MW · 740 MWh 2025 –

Questions

McFarland C, answered

How much can McFarland C store and deliver?

McFarland C can deliver up to 185 MW and hold 740 MWh of energy, from one battery or storage system. Its net energy in 2025 was -12.0 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is McFarland C?

McFarland C is in Yuma County, Arizona, at about 32.946°, -113.492°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates McFarland C?

It is operated by AES Clean Energy (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did McFarland C open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.