Storage power plant · Yuma, AZ

Sierra Pinta BESS

Sierra Pinta BESS is a 113 MW storage power plant in Yuma County, Arizona, operated by Leeward Asset Management, LLC. Its oldest generator still running came online in 2025.

Capacity113 MWNameplate, September 2026
Net energy-5.1 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Sierra Pinta BESS in context

Among the 41 storage plants in Arizona in the EIA's inventory, it is the 22nd largest, about 1.8% of the state's 6.3 GW of storage capacity.

Yuma County has 13 power plants of 1 MW or more with 2.4 GW in all; Sierra Pinta BESS is 5% of that and the 3rd largest of 4 storage plants there.

The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.

Where it is

Sierra Pinta BESS (outlined) and other plants in Yuma County, shaded. 32.994, -113.510.

Plant facts

Operator
Leeward Asset Management, LLC
Sector
IPP Non-CHP
Grid operator
AZPS
County
Yuma County, AZ
EIA plant ID
67973
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SP01 Batteries 113 MW · 113 MWh 2025 –

Questions

Sierra Pinta BESS, answered

How much can Sierra Pinta BESS store and deliver?

Sierra Pinta BESS can deliver up to 113 MW and hold 113 MWh of energy, from one battery or storage system. Its net energy in 2025 was -5.1 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Sierra Pinta BESS?

Sierra Pinta BESS is in Yuma County, Arizona, at about 32.994°, -113.510°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Yuma County goes 1.5 hours a year without power, the 8th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Sierra Pinta BESS?

It is operated by Leeward Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.

When did Sierra Pinta BESS open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.