Solar power plant · Polk, FL
Alafia Solar
Alafia Solar is a 60 MW solar power plant in Polk County, Florida, operated by Tampa Electric Co. Its oldest generator still running came online in 2023. In 2025 it generated 118 GWh, about what 8,900 average Florida homes use in a year.
Alafia Solar in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 170th largest, about 0.4% of the state's 14 GW of solar capacity.
Polk County has 29 power plants of 1 MW or more with 6.7 GW in all; Alafia Solar is 1% of that and the 5th largest of 15 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Polk County goes 9.9 hours a year without power, the 33rd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Alafia Solar (outlined) and other plants in Polk County, shaded. 27.723, -82.026.
Plant facts
- Operator
- Tampa Electric Co
- Sector
- Electric Utility
- Grid operator
- TEC
- County
- Polk County, FL
- EIA plant ID
- 61653
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 60 MW | 2023 | – |
Questions
Alafia Solar, answered
How much power does Alafia Solar produce?
Alafia Solar has 60 MW of capacity from one generator. In 2025 it generated 118 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Alafia Solar power?
Its 2025 output of 118 GWh equals the yearly electricity use of about 8,900 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Alafia Solar?
Alafia Solar is in Polk County, Florida, at about 27.723°, -82.026°. It is one of 29 power plants of 1 MW or more in the county. The average electricity customer in Polk County goes 9.9 hours a year without power, the 33rd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Alafia Solar?
It is operated by Tampa Electric Co (EIA sector: Electric Utility), and it feeds balancing authority TEC.
When did Alafia Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.