Natural gas power plant · Pasco, FL
Anclote
Anclote is a 1.1 GW natural gas power plant in Pasco County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 1974. In 2025 it generated 2.0 TWh, about what 152,000 average Florida homes use in a year.
Anclote in context
Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 21st largest, about 2.0% of the state's 56 GW of natural gas capacity.
Pasco County has 5 power plants of 1 MW or more with 1.8 GW in all; Anclote is 61% of that and the largest of 2 natural gas plants there.
Its capacity factor of 21% in 2025 is close to the 23% typical for natural gas plants across the US.
The average electricity customer in Pasco County goes 7.4 hours a year without power, the 38th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Anclote (outlined) and other plants in Pasco County, shaded. 28.184, -82.789.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Pasco County, FL
- EIA plant ID
- 8048
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | 556 MW | 1974 | – |
| 2 | Natural Gas Steam Turbine | 556 MW | 1978 | – |
Questions
Anclote, answered
How much power does Anclote produce?
Anclote has 1.1 GW of capacity from 2 generators. In 2025 it generated 2.0 TWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Anclote power?
Its 2025 output of 2.0 TWh equals the yearly electricity use of about 152,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Anclote?
Anclote is in Pasco County, Florida, at about 28.184°, -82.789°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Pasco County goes 7.4 hours a year without power, the 38th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Anclote?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did Anclote open?
Its oldest generator still running came online in 1974.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.