Solar power plant · Pasco, FL
Juniper Solar (FL)
Juniper Solar (FL) is a 70 MW solar power plant in Pasco County, Florida, operated by Tampa Electric Co. Its oldest generator still running came online in 2023. In 2025 it generated 148 GWh, about what 11,000 average Florida homes use in a year.
Juniper Solar (FL) in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 166th largest, about 0.5% of the state's 14 GW of solar capacity.
Pasco County has 5 power plants of 1 MW or more with 1.8 GW in all; Juniper Solar (FL) is 4% of that and the largest of 2 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Pasco County goes 7.4 hours a year without power, the 38th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Juniper Solar (FL) (outlined) and other plants in Pasco County, shaded. 28.182, -82.155.
Plant facts
- Operator
- Tampa Electric Co
- Sector
- Electric Utility
- Grid operator
- TEC
- County
- Pasco County, FL
- EIA plant ID
- 65683
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 70 MW | 2023 | – |
Nearby
Other plants in Pasco County
Questions
Juniper Solar (FL), answered
How much power does Juniper Solar (FL) produce?
Juniper Solar (FL) has 70 MW of capacity from one generator. In 2025 it generated 148 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Juniper Solar (FL) power?
Its 2025 output of 148 GWh equals the yearly electricity use of about 11,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Juniper Solar (FL)?
Juniper Solar (FL) is in Pasco County, Florida, at about 28.182°, -82.155°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Pasco County goes 7.4 hours a year without power, the 38th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Juniper Solar (FL)?
It is operated by Tampa Electric Co (EIA sector: Electric Utility), and it feeds balancing authority TEC.
When did Juniper Solar (FL) open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.