Solar power plant · Pasco, FL

Juniper Solar (FL)

Juniper Solar (FL) is a 70 MW solar power plant in Pasco County, Florida, operated by Tampa Electric Co. Its oldest generator still running came online in 2023. In 2025 it generated 148 GWh, about what 11,000 average Florida homes use in a year.

Capacity70 MWNameplate, September 2026
Generated148 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2023

Juniper Solar (FL) in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 166th largest, about 0.5% of the state's 14 GW of solar capacity.

Pasco County has 5 power plants of 1 MW or more with 1.8 GW in all; Juniper Solar (FL) is 4% of that and the largest of 2 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Pasco County goes 7.4 hours a year without power, the 38th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150200202320242025GWh 148
050100150200202320242025148

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Juniper Solar (FL) (outlined) and other plants in Pasco County, shaded. 28.182, -82.155.

Plant facts

Operator
Tampa Electric Co
Sector
Electric Utility
Grid operator
TEC
County
Pasco County, FL
EIA plant ID
65683
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 70 MW 2023 –

Questions

Juniper Solar (FL), answered

How much power does Juniper Solar (FL) produce?

Juniper Solar (FL) has 70 MW of capacity from one generator. In 2025 it generated 148 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does Juniper Solar (FL) power?

Its 2025 output of 148 GWh equals the yearly electricity use of about 11,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Juniper Solar (FL)?

Juniper Solar (FL) is in Pasco County, Florida, at about 28.182°, -82.155°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Pasco County goes 7.4 hours a year without power, the 38th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Juniper Solar (FL)?

It is operated by Tampa Electric Co (EIA sector: Electric Utility), and it feeds balancing authority TEC.

When did Juniper Solar (FL) open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.