Natural gas power plant · Worcester, MA
ANP Blackstone Energy Project
ANP Blackstone Energy Project is a 578 MW natural gas power plant in Worcester County, Massachusetts, operated by ANP Blackstone Energy Company LLC. Its oldest generator still running came online in 2001. In 2025 it generated 3.3 TWh, about what 455,000 average Massachusetts homes use in a year.
ANP Blackstone Energy Project in context
Among the 42 natural gas plants in Massachusetts in the EIA's inventory, it is the 4th largest, about 9.6% of the state's 6.0 GW of natural gas capacity.
Worcester County has 191 power plants of 1 MW or more with 2.0 GW in all; ANP Blackstone Energy Project is 29% of that and the largest of 8 natural gas plants there.
Its capacity factor of 64% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Worcester County goes 4.0 hours a year without power, the 9th most of 14 counties in Massachusetts. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
ANP Blackstone Energy Project (outlined) and other plants in Worcester County, shaded. 42.060, -71.516.
Plant facts
- Operator
- ANP Blackstone Energy Company LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Worcester County, MA
- EIA plant ID
- 55212
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| U1 | Natural Gas Fired Combined Cycle | 289 MW | 2001 | – |
| U2 | Natural Gas Fired Combined Cycle | 289 MW | 2001 | – |
Questions
ANP Blackstone Energy Project, answered
How much power does ANP Blackstone Energy Project produce?
ANP Blackstone Energy Project has 578 MW of capacity from 2 generators. In 2025 it generated 3.3 TWh, 64% of the most it could have made running flat out all year (its capacity factor).
How many homes does ANP Blackstone Energy Project power?
Its 2025 output of 3.3 TWh equals the yearly electricity use of about 455,000 average Massachusetts homes (596 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is ANP Blackstone Energy Project?
ANP Blackstone Energy Project is in Worcester County, Massachusetts, at about 42.060°, -71.516°. It is one of 191 power plants of 1 MW or more in the county. The average electricity customer in Worcester County goes 4.0 hours a year without power, the 9th most of 14 counties in Massachusetts. The county's page has the full outage record.
Who operates ANP Blackstone Energy Project?
It is operated by ANP Blackstone Energy Company LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did ANP Blackstone Energy Project open?
Its oldest generator still running came online in 2001.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Massachusetts home's 596 kWh a month in 2025. Methodology.