Solar power plant · Worcester, MA
SJA Solar LLC-Solterra Monastery CSG
SJA Solar LLC-Solterra Monastery CSG is a 15 MW solar power plant in Worcester County, Massachusetts, operated by SJA Solar, LLC. Its oldest generator still running came online in 2016. In 2025 it generated 24 GWh, about what 3,300 average Massachusetts homes use in a year.
SJA Solar LLC-Solterra Monastery CSG in context
Among the 533 solar plants in Massachusetts in the EIA's inventory, it is the largest, about 0.9% of the state's 1.7 GW of solar capacity.
Worcester County has 191 power plants of 1 MW or more with 2.0 GW in all; SJA Solar LLC-Solterra Monastery CSG is 1% of that and the largest of 166 solar plants there.
Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Worcester County goes 4.0 hours a year without power, the 9th most of 14 counties in Massachusetts. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
SJA Solar LLC-Solterra Monastery CSG (outlined) and other plants in Worcester County, shaded. 42.283, -72.008.
Plant facts
- Operator
- SJA Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Worcester County, MA
- EIA plant ID
- 60391
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SJAPV | Solar Photovoltaic | 15 MW | 2016 | – |
Questions
SJA Solar LLC-Solterra Monastery CSG, answered
How much power does SJA Solar LLC-Solterra Monastery CSG produce?
SJA Solar LLC-Solterra Monastery CSG has 15 MW of capacity from one generator. In 2025 it generated 24 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does SJA Solar LLC-Solterra Monastery CSG power?
Its 2025 output of 24 GWh equals the yearly electricity use of about 3,300 average Massachusetts homes (596 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is SJA Solar LLC-Solterra Monastery CSG?
SJA Solar LLC-Solterra Monastery CSG is in Worcester County, Massachusetts, at about 42.283°, -72.008°. It is one of 191 power plants of 1 MW or more in the county. The average electricity customer in Worcester County goes 4.0 hours a year without power, the 9th most of 14 counties in Massachusetts. The county's page has the full outage record.
Who operates SJA Solar LLC-Solterra Monastery CSG?
It is operated by SJA Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did SJA Solar LLC-Solterra Monastery CSG open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Massachusetts home's 596 kWh a month in 2025. Methodology.