Solar power plant · Clark, NV

Apex Solar PV Power Project

Apex Solar PV Power Project is a 20 MW solar power plant in Clark County, Nevada, operated by Southern Power Co. Its oldest generator still running came online in 2012. In 2025 it generated 48 GWh, about what 4,600 average Nevada homes use in a year.

Capacity20 MWNameplate, September 2026
Generated48 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2012

Apex Solar PV Power Project in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the 36th largest, about 0.3% of the state's 6.2 GW of solar capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Apex Solar PV Power Project is 0% of that and the 28th largest of 45 solar plants there.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406020182019202020212022202320242025GWh 48
0204060201920212023202548

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Apex Solar PV Power Project (outlined) and other plants in Clark County, shaded. 36.390, -114.970.

Plant facts

Operator
Southern Power Co
Sector
IPP Non-CHP
Grid operator
NEVP
County
Clark County, NV
EIA plant ID
58489
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 20 MW 2012 –

Questions

Apex Solar PV Power Project, answered

How much power does Apex Solar PV Power Project produce?

Apex Solar PV Power Project has 20 MW of capacity from one generator. In 2025 it generated 48 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Apex Solar PV Power Project power?

Its 2025 output of 48 GWh equals the yearly electricity use of about 4,600 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Apex Solar PV Power Project?

Apex Solar PV Power Project is in Clark County, Nevada, at about 36.390°, -114.970°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Apex Solar PV Power Project?

It is operated by Southern Power Co (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Apex Solar PV Power Project open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.