Solar power plant · Clark, NV
Arrow Canyon Solar Hybrid
Arrow Canyon Solar Hybrid is a 275 MW solar power plant in Clark County, Nevada, operated by Arrow Canyon Solar LLC. Its oldest generator still running came online in 2023. In 2025 it generated 595 GWh, about what 57,000 average Nevada homes use in a year.
Arrow Canyon Solar Hybrid in context
Among the 58 solar plants in Nevada in the EIA's inventory, it is the 4th largest, about 4.4% of the state's 6.2 GW of solar capacity.
Clark County has 64 power plants of 1 MW or more with 14 GW in all; Arrow Canyon Solar Hybrid is 2% of that and the 3rd largest of 45 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Arrow Canyon Solar Hybrid (outlined) and other plants in Clark County, shaded. 36.459, -114.844.
Plant facts
- Operator
- Arrow Canyon Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- NEVP
- County
- Clark County, NV
- EIA plant ID
- 62248
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 200 MW | 2023 | – |
| 2 | Batteries | 75 MW · 375 MWh | 2023 | – |
Questions
Arrow Canyon Solar Hybrid, answered
How much power does Arrow Canyon Solar Hybrid produce?
Arrow Canyon Solar Hybrid has 275 MW of capacity from 2 generators. In 2025 it generated 595 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Arrow Canyon Solar Hybrid power?
Its 2025 output of 595 GWh equals the yearly electricity use of about 57,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Arrow Canyon Solar Hybrid?
Arrow Canyon Solar Hybrid is in Clark County, Nevada, at about 36.459°, -114.844°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates Arrow Canyon Solar Hybrid?
It is operated by Arrow Canyon Solar LLC (EIA sector: IPP Non-CHP), and it feeds NV Energy.
When did Arrow Canyon Solar Hybrid open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.