Avalon Solar II is a 16 MW solar power plant in Pima County, Arizona, operated by Avalon Solar Partners II, LLC. Its oldest generator still running came online in 2016. In 2025 it generated 43 GWh, about what 3,500 average Arizona homes use in a year.
Avalon Solar II in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 56th largest, about 0.2% of the state's 9.9 GW of solar capacity.
Pima County has 38 power plants of 1 MW or more with 2.1 GW in all; Avalon Solar II is 1% of that and the 5th largest of 27 solar plants there.
Its capacity factor of 31% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Pima County goes 1.4 hours a year without power, the 9th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Avalon Solar II (outlined) and other plants in Pima County, shaded. 32.001, -110.958.
Plant facts
- Operator
- Avalon Solar Partners II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- TEPC
- County
- Pima County, AZ
- EIA plant ID
- 60062
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ASII | Solar Photovoltaic | 16 MW | 2016 | – |
Questions
Avalon Solar II, answered
How much power does Avalon Solar II produce?
Avalon Solar II has 16 MW of capacity from one generator. In 2025 it generated 43 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Avalon Solar II power?
Its 2025 output of 43 GWh equals the yearly electricity use of about 3,500 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Avalon Solar II?
Avalon Solar II is in Pima County, Arizona, at about 32.001°, -110.958°. It is one of 38 power plants of 1 MW or more in the county. The average electricity customer in Pima County goes 1.4 hours a year without power, the 9th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Avalon Solar II?
It is operated by Avalon Solar Partners II, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority TEPC.
When did Avalon Solar II open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.