Solar power plant · Pima, AZ

Avra Valley Solar

Avra Valley Solar is a 25 MW solar power plant in Pima County, Arizona, operated by Solar Avra Valley LLC. Its oldest generator still running came online in 2013. In 2025 it generated 62 GWh, about what 5,000 average Arizona homes use in a year.

Capacity25 MWNameplate, September 2026
Generated62 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2013

Avra Valley Solar in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 50th largest, about 0.3% of the state's 9.9 GW of solar capacity.

Pima County has 38 power plants of 1 MW or more with 2.1 GW in all; Avra Valley Solar is 1% of that and the 3rd largest of 27 solar plants there.

Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Pima County goes 1.4 hours a year without power, the 9th most of 11 counties in Arizona. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608020182019202020212022202320242025GWh 62
020406080201920212023202562

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Avra Valley Solar (outlined) and other plants in Pima County, shaded. 32.372, -111.283.

Plant facts

Operator
Solar Avra Valley LLC
Sector
IPP Non-CHP
Grid operator
TEPC
County
Pima County, AZ
EIA plant ID
57657
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 25 MW 2013 –

Questions

Avra Valley Solar, answered

How much power does Avra Valley Solar produce?

Avra Valley Solar has 25 MW of capacity from one generator. In 2025 it generated 62 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does Avra Valley Solar power?

Its 2025 output of 62 GWh equals the yearly electricity use of about 5,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Avra Valley Solar?

Avra Valley Solar is in Pima County, Arizona, at about 32.372°, -111.283°. It is one of 38 power plants of 1 MW or more in the county. The average electricity customer in Pima County goes 1.4 hours a year without power, the 9th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Avra Valley Solar?

It is operated by Solar Avra Valley LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority TEPC.

When did Avra Valley Solar open?

Its oldest generator still running came online in 2013.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.