Oil power plant · Pinellas, FL

Bayboro

Bayboro is a 170 MW oil power plant in Pinellas County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 1973. In 2025 it generated 1.3 GWh, about what 98 average Florida homes use in a year.

Capacity170 MWNameplate, September 2026
Generated1.3 GWhIn 2025
Capacity factor0%Share of the most it could make, 2025
Generators3Oldest from 1973

Bayboro in context

Among the 40 other-fuel plants in Florida in the EIA's inventory, it is the 2nd largest, about 6.5% of the state's 2.6 GW of other-fuel capacity.

Pinellas County has 5 power plants of 1 MW or more with 1.7 GW in all; Bayboro is 10% of that and the largest of 2 oil plants there.

Its capacity factor of 0% in 2025 is lower than the 25% typical for oil plants across the US.

The average electricity customer in Pinellas County goes 23 hours a year without power, the 12th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

024681020182019202020212022202320242025GWh 1
024681020192021202320251

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Bayboro (outlined) and other plants in Pinellas County, shaded. 27.758, -82.635.

Plant facts

Operator
Duke Energy Florida, LLC
Sector
Electric Utility
Grid operator
FPC
County
Pinellas County, FL
EIA plant ID
627
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
P1 Petroleum Liquids 57 MW 1973 2026
P2 Petroleum Liquids 57 MW 1973 2026
P4 Petroleum Liquids 57 MW 1973 2026

Retired

GeneratorTechnologyCapacityOnlineRetired
P3Petroleum Liquids57 MW19732025

Nearby

Other plants in Pinellas County

P L Bartow · 1.5 GWPinellas County Resource Recovery · 77 MWJohn Hopkins Middle School Microgrid · 3.3 MWLockheed Martin Solar System · 1.9 MW

Questions

Bayboro, answered

How much power does Bayboro produce?

Bayboro has 170 MW of capacity from 3 generators. In 2025 it generated 1.3 GWh, 0% of the most it could have made running flat out all year (its capacity factor).

How many homes does Bayboro power?

Its 2025 output of 1.3 GWh equals the yearly electricity use of about 98 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Bayboro?

Bayboro is in Pinellas County, Florida, at about 27.758°, -82.635°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Pinellas County goes 23 hours a year without power, the 12th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Bayboro?

It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.

When did Bayboro open?

Its oldest generator still running came online in 1973. Planned retirements are scheduled for 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.