Natural gas power plant · Pinellas, FL
P L Bartow
P L Bartow is a 1.5 GW natural gas power plant in Pinellas County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 1972. In 2025 it generated 6.0 TWh, about what 452,000 average Florida homes use in a year.
P L Bartow in context
Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 13th largest, about 2.6% of the state's 56 GW of natural gas capacity.
Pinellas County has 5 power plants of 1 MW or more with 1.7 GW in all; P L Bartow is 85% of that.
Its capacity factor of 46% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Pinellas County goes 23 hours a year without power, the 12th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
P L Bartow (outlined) and other plants in Pinellas County, shaded. 27.860, -82.602.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Pinellas County, FL
- EIA plant ID
- 634
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 4ST | Natural Gas Fired Combined Cycle | 421 MW | 2009 | – |
| 4AGT | Natural Gas Fired Combined Cycle | 208 MW | 2009 | – |
| 4BGT | Natural Gas Fired Combined Cycle | 208 MW | 2009 | – |
| 4CGT | Natural Gas Fired Combined Cycle | 208 MW | 2009 | – |
| 4DGT | Natural Gas Fired Combined Cycle | 208 MW | 2009 | – |
| P1 | Petroleum Liquids | 55 MW | 1972 | 2034 |
| P2 | Natural Gas Fired Combustion Turbine | 55 MW | 1972 | 2034 |
| P3 | Petroleum Liquids | 55 MW | 1972 | 2034 |
| P4 | Natural Gas Fired Combustion Turbine | 55 MW | 1972 | 2034 |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| ST1 | Petroleum Liquids | 128 MW | 1958 | 2009 |
| ST2 | Petroleum Liquids | 128 MW | 1961 | 2009 |
| ST3 | Petroleum Liquids | 239 MW | 1963 | 2009 |
Nearby
Other plants in Pinellas County
Questions
P L Bartow, answered
How much power does P L Bartow produce?
P L Bartow has 1.5 GW of capacity from 9 generators. In 2025 it generated 6.0 TWh, 46% of the most it could have made running flat out all year (its capacity factor).
How many homes does P L Bartow power?
Its 2025 output of 6.0 TWh equals the yearly electricity use of about 452,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is P L Bartow?
P L Bartow is in Pinellas County, Florida, at about 27.860°, -82.602°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Pinellas County goes 23 hours a year without power, the 12th most of 67 counties in Florida. The county's page has the full outage record.
Who operates P L Bartow?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did P L Bartow open?
Its oldest generator still running came online in 1972. Planned retirements are scheduled for 2034.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.