Big Juniper Solar is a 75 MW solar power plant in Santa Rosa County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2024. In 2025 it generated 167 GWh, about what 13,000 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated167 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 2024

Big Juniper Solar in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 105th largest, about 0.5% of the state's 14 GW of solar capacity.

Santa Rosa County has 5 power plants of 1 MW or more with 552 MW in all; Big Juniper Solar is 13% of that and the 2nd largest of 3 solar plants there.

Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Santa Rosa County goes 6.5 hours a year without power, the 43rd most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020242025GWh 167
05010015020020242025167

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Big Juniper Solar (outlined) and other plants in Santa Rosa County, shaded. 30.639, -86.926.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
Santa Rosa County, FL
EIA plant ID
65862
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2024 –

Questions

Big Juniper Solar, answered

How much power does Big Juniper Solar produce?

Big Juniper Solar has 75 MW of capacity from one generator. In 2025 it generated 167 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Big Juniper Solar power?

Its 2025 output of 167 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Big Juniper Solar?

Big Juniper Solar is in Santa Rosa County, Florida, at about 30.639°, -86.926°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Santa Rosa County goes 6.5 hours a year without power, the 43rd most of 67 counties in Florida. The county's page has the full outage record.

Who operates Big Juniper Solar?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Big Juniper Solar open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.