Solar power plant · Santa Rosa, FL
Gulf Coast Solar Center II
Gulf Coast Solar Center II is a 40 MW solar power plant in Santa Rosa County, Florida, operated by Arevon Energy, Inc.. Its oldest generator still running came online in 2017. In 2025 it generated 79 GWh, about what 6,000 average Florida homes use in a year.
Gulf Coast Solar Center II in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 180th largest, about 0.3% of the state's 14 GW of solar capacity.
Santa Rosa County has 5 power plants of 1 MW or more with 552 MW in all; Gulf Coast Solar Center II is 7% of that and the 3rd largest of 3 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Santa Rosa County goes 6.5 hours a year without power, the 43rd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Gulf Coast Solar Center II (outlined) and other plants in Santa Rosa County, shaded. 30.431, -86.895.
Plant facts
- Operator
- Arevon Energy, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- SOCO
- County
- Santa Rosa County, FL
- EIA plant ID
- 59690
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GCSC2 | Solar Photovoltaic | 40 MW | 2017 | – |
Nearby
Other plants in Santa Rosa County
Questions
Gulf Coast Solar Center II, answered
How much power does Gulf Coast Solar Center II produce?
Gulf Coast Solar Center II has 40 MW of capacity from one generator. In 2025 it generated 79 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Gulf Coast Solar Center II power?
Its 2025 output of 79 GWh equals the yearly electricity use of about 6,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Gulf Coast Solar Center II?
Gulf Coast Solar Center II is in Santa Rosa County, Florida, at about 30.431°, -86.895°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Santa Rosa County goes 6.5 hours a year without power, the 43rd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Gulf Coast Solar Center II?
It is operated by Arevon Energy, Inc. (EIA sector: IPP Non-CHP), and it feeds Southern Company.
When did Gulf Coast Solar Center II open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.