Coal power plant · Grant, SD
Big Stone
Big Stone is a 451 MW coal power plant in Grant County, South Dakota, operated by Otter Tail Power Co. Its oldest generator still running came online in 1975. In 2025 it generated 2.0 TWh, about what 172,000 average South Dakota homes use in a year.
Big Stone in context
Grant County has 5 power plants of 1 MW or more with 915 MW in all; Big Stone is 49% of that.
Its capacity factor of 51% in 2025 is close to the 45% typical for coal plants across the US.
The average electricity customer in Grant County goes 26 hours a year without power, the 2nd most of 32 counties in South Dakota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Big Stone (outlined) and other plants in Grant County, shaded. 45.304, -96.510.
Plant facts
- Operator
- Otter Tail Power Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Grant County, SD
- EIA plant ID
- 6098
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Steam Coal | 450 MW | 1975 | – |
| D1 | Petroleum Liquids | 1.0 MW | 1975 | – |
Nearby
Other plants in Grant County
Questions
Big Stone, answered
How much power does Big Stone produce?
Big Stone has 451 MW of capacity from 2 generators. In 2025 it generated 2.0 TWh, 51% of the most it could have made running flat out all year (its capacity factor).
How many homes does Big Stone power?
Its 2025 output of 2.0 TWh equals the yearly electricity use of about 172,000 average South Dakota homes (984 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Big Stone?
Big Stone is in Grant County, South Dakota, at about 45.304°, -96.510°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Grant County goes 26 hours a year without power, the 2nd most of 32 counties in South Dakota. The county's page has the full outage record.
Who operates Big Stone?
It is operated by Otter Tail Power Co (EIA sector: Electric Utility), and it feeds MISO.
When did Big Stone open?
Its oldest generator still running came online in 1975.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average South Dakota home's 984 kWh a month in 2025. Methodology.