Wind power plant · Grant, SD
Dakota Range Wind
Dakota Range Wind is a 304 MW wind power plant in Grant County, South Dakota, operated by Northern States Power Co - Minnesota. Its oldest generator still running came online in 2022. In 2025 it generated 1.0 TWh, about what 86,000 average South Dakota homes use in a year.
Dakota Range Wind in context
Among the 25 wind plants in South Dakota in the EIA's inventory, it is the largest, about 8.8% of the state's 3.5 GW of wind capacity.
Grant County has 5 power plants of 1 MW or more with 915 MW in all; Dakota Range Wind is 33% of that and the largest of 2 wind plants there.
Its capacity factor of 38% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Grant County goes 26 hours a year without power, the 2nd most of 32 counties in South Dakota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Dakota Range Wind (outlined) and other plants in Grant County, shaded. 45.224, -97.023.
Plant facts
- Operator
- Northern States Power Co - Minnesota
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Grant County, SD
- EIA plant ID
- 68318
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DKR01 | Onshore Wind Turbine | 304 MW | 2022 | – |
Nearby
Other plants in Grant County
Questions
Dakota Range Wind, answered
How much power does Dakota Range Wind produce?
Dakota Range Wind has 304 MW of capacity from one generator. In 2025 it generated 1.0 TWh, 38% of the most it could have made running flat out all year (its capacity factor).
How many homes does Dakota Range Wind power?
Its 2025 output of 1.0 TWh equals the yearly electricity use of about 86,000 average South Dakota homes (984 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Dakota Range Wind?
Dakota Range Wind is in Grant County, South Dakota, at about 45.224°, -97.023°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Grant County goes 26 hours a year without power, the 2nd most of 32 counties in South Dakota. The county's page has the full outage record.
Who operates Dakota Range Wind?
It is operated by Northern States Power Co - Minnesota (EIA sector: Electric Utility), and it feeds MISO.
When did Dakota Range Wind open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average South Dakota home's 984 kWh a month in 2025. Methodology.