Wind power plant · Grant, SD
Dakota Range III Wind Project
Dakota Range III Wind Project is a 154 MW wind power plant in Grant County, South Dakota, operated by Engie North America. Its oldest generator still running came online in 2021. In 2025 it generated 619 GWh, about what 52,000 average South Dakota homes use in a year.
Dakota Range III Wind Project in context
Among the 25 wind plants in South Dakota in the EIA's inventory, it is the 13th largest, about 4.4% of the state's 3.5 GW of wind capacity.
Grant County has 5 power plants of 1 MW or more with 915 MW in all; Dakota Range III Wind Project is 17% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 46% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Grant County goes 26 hours a year without power, the 2nd most of 32 counties in South Dakota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Dakota Range III Wind Project (outlined) and other plants in Grant County, shaded. 45.268, -97.104.
Plant facts
- Operator
- Engie North America
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Grant County, SD
- EIA plant ID
- 63102
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WTG | Onshore Wind Turbine | 154 MW | 2021 | – |
Nearby
Other plants in Grant County
Questions
Dakota Range III Wind Project, answered
How much power does Dakota Range III Wind Project produce?
Dakota Range III Wind Project has 154 MW of capacity from one generator. In 2025 it generated 619 GWh, 46% of the most it could have made running flat out all year (its capacity factor).
How many homes does Dakota Range III Wind Project power?
Its 2025 output of 619 GWh equals the yearly electricity use of about 52,000 average South Dakota homes (984 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Dakota Range III Wind Project?
Dakota Range III Wind Project is in Grant County, South Dakota, at about 45.268°, -97.104°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Grant County goes 26 hours a year without power, the 2nd most of 32 counties in South Dakota. The county's page has the full outage record.
Who operates Dakota Range III Wind Project?
It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Dakota Range III Wind Project open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average South Dakota home's 984 kWh a month in 2025. Methodology.