Wind power plant · Huron, MI
Big Turtle Wind Farm 2
Big Turtle Wind Farm 2 is a 29 MW wind power plant in Huron County, Michigan, operated by DTE Electric Company. Its oldest generator still running came online in 2016. In 2025 it generated 104 GWh, about what 14,000 average Michigan homes use in a year.
Big Turtle Wind Farm 2 in context
Among the 34 wind plants in Michigan in the EIA's inventory, it is the 31st largest, about 0.8% of the state's 3.8 GW of wind capacity.
Huron County has 18 power plants of 1 MW or more with 1.0 GW in all; Big Turtle Wind Farm 2 is 3% of that and the 11th largest of 13 wind plants there.
Its capacity factor of 40% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Huron County goes 36 hours a year without power, the 6th most of 83 counties in Michigan. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Big Turtle Wind Farm 2 (outlined) and other plants in Huron County, shaded. 43.920, -82.794.
Plant facts
- Operator
- DTE Electric Company
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Huron County, MI
- EIA plant ID
- 65143
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BTWF2 | Onshore Wind Turbine | 29 MW | 2016 | – |
Questions
Big Turtle Wind Farm 2, answered
How much power does Big Turtle Wind Farm 2 produce?
Big Turtle Wind Farm 2 has 29 MW of capacity from one generator. In 2025 it generated 104 GWh, 40% of the most it could have made running flat out all year (its capacity factor).
How many homes does Big Turtle Wind Farm 2 power?
Its 2025 output of 104 GWh equals the yearly electricity use of about 14,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Big Turtle Wind Farm 2?
Big Turtle Wind Farm 2 is in Huron County, Michigan, at about 43.920°, -82.794°. It is one of 18 power plants of 1 MW or more in the county. The average electricity customer in Huron County goes 36 hours a year without power, the 6th most of 83 counties in Michigan. The county's page has the full outage record.
Who operates Big Turtle Wind Farm 2?
It is operated by DTE Electric Company (EIA sector: Electric Utility), and it feeds MISO.
When did Big Turtle Wind Farm 2 open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.