Solar power plant · Indian River, FL
Blue Cypress Solar Energy Center
Blue Cypress Solar Energy Center is a 75 MW solar power plant in Indian River County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2018. In 2025 it generated 131 GWh, about what 9,900 average Florida homes use in a year.
Blue Cypress Solar Energy Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 44th largest, about 0.5% of the state's 14 GW of solar capacity.
Indian River County has 5 power plants of 1 MW or more with 373 MW in all; Blue Cypress Solar Energy Center is 20% of that and the 2nd largest of 5 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Indian River County goes 9.6 hours a year without power, the 34th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Blue Cypress Solar Energy Center (outlined) and other plants in Indian River County, shaded. 27.609, -80.537.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Indian River County, FL
- EIA plant ID
- 61029
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2018 | – |
Nearby
Other plants in Indian River County
Questions
Blue Cypress Solar Energy Center, answered
How much power does Blue Cypress Solar Energy Center produce?
Blue Cypress Solar Energy Center has 75 MW of capacity from one generator. In 2025 it generated 131 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Blue Cypress Solar Energy Center power?
Its 2025 output of 131 GWh equals the yearly electricity use of about 9,900 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Blue Cypress Solar Energy Center?
Blue Cypress Solar Energy Center is in Indian River County, Florida, at about 27.609°, -80.537°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Indian River County goes 9.6 hours a year without power, the 34th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Blue Cypress Solar Energy Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Blue Cypress Solar Energy Center open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.