Solar power plant · Sterling, TX

Bluebell Solar

Bluebell Solar is a 30 MW solar power plant in Sterling County, Texas, operated by Bluebell Solar, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 72 GWh, about what 5,400 average Texas homes use in a year.

Capacity30 MWNameplate, September 2026
Generated72 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2018

Bluebell Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 173rd largest, about 0.1% of the state's 37 GW of solar capacity.

Sterling County has 6 power plants of 1 MW or more with 1.5 GW in all; Bluebell Solar is 2% of that and the 2nd largest of 2 solar plants there.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Sterling County goes 24 hours a year without power, the 26th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608010020182019202020212022202320242025GWh 72
020406080100201920212023202572

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Bluebell Solar (outlined) and other plants in Sterling County, shaded. 31.870, -100.828.

Plant facts

Operator
Bluebell Solar, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Sterling County, TX
EIA plant ID
60789
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
UNIT1 Solar Photovoltaic 30 MW 2018 –

Questions

Bluebell Solar, answered

How much power does Bluebell Solar produce?

Bluebell Solar has 30 MW of capacity from one generator. In 2025 it generated 72 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Bluebell Solar power?

Its 2025 output of 72 GWh equals the yearly electricity use of about 5,400 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Bluebell Solar?

Bluebell Solar is in Sterling County, Texas, at about 31.870°, -100.828°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Sterling County goes 24 hours a year without power, the 26th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Bluebell Solar?

It is operated by Bluebell Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Bluebell Solar open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.