Wind power plant · Sterling, TX
Goat Wind LP
Goat Wind LP is a 150 MW wind power plant in Sterling County, Texas, operated by Goat Wind LLC. Its oldest generator still running came online in 2008. In 2025 it generated 271 GWh, about what 20,000 average Texas homes use in a year.
Goat Wind LP in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 159th largest, about 0.3% of the state's 45 GW of wind capacity.
Sterling County has 6 power plants of 1 MW or more with 1.5 GW in all; Goat Wind LP is 10% of that and the 4th largest of 4 wind plants there.
Its capacity factor of 21% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Sterling County goes 24 hours a year without power, the 26th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Goat Wind LP (outlined) and other plants in Sterling County, shaded. 31.952, -100.791.
Plant facts
- Operator
- Goat Wind LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Sterling County, TX
- EIA plant ID
- 56754
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 80 MW | 2008 | – |
| 2 | Onshore Wind Turbine | 70 MW | 2009 | – |
Questions
Goat Wind LP, answered
How much power does Goat Wind LP produce?
Goat Wind LP has 150 MW of capacity from 2 generators. In 2025 it generated 271 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Goat Wind LP power?
Its 2025 output of 271 GWh equals the yearly electricity use of about 20,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Goat Wind LP?
Goat Wind LP is in Sterling County, Texas, at about 31.952°, -100.791°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Sterling County goes 24 hours a year without power, the 26th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Goat Wind LP?
It is operated by Goat Wind LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Goat Wind LP open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.