Solar power plant · Sterling, TX
Bluebell Solar II
Bluebell Solar II is a 115 MW solar power plant in Sterling County, Texas, operated by Bluebell Solar II, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 255 GWh, about what 19,000 average Texas homes use in a year.
Bluebell Solar II in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 133rd largest, about 0.3% of the state's 37 GW of solar capacity.
Sterling County has 6 power plants of 1 MW or more with 1.5 GW in all; Bluebell Solar II is 8% of that and the largest of 2 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Sterling County goes 24 hours a year without power, the 26th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bluebell Solar II (outlined) and other plants in Sterling County, shaded. 31.888, -100.825.
Plant facts
- Operator
- Bluebell Solar II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Sterling County, TX
- EIA plant ID
- 63351
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BBS2 | Solar Photovoltaic | 115 MW | 2020 | – |
Nearby
Other plants in Sterling County
Questions
Bluebell Solar II, answered
How much power does Bluebell Solar II produce?
Bluebell Solar II has 115 MW of capacity from one generator. In 2025 it generated 255 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bluebell Solar II power?
Its 2025 output of 255 GWh equals the yearly electricity use of about 19,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bluebell Solar II?
Bluebell Solar II is in Sterling County, Texas, at about 31.888°, -100.825°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Sterling County goes 24 hours a year without power, the 26th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Bluebell Solar II?
It is operated by Bluebell Solar II, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Bluebell Solar II open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.