Solar power plant · Sterling, TX

Bluebell Solar II

Bluebell Solar II is a 115 MW solar power plant in Sterling County, Texas, operated by Bluebell Solar II, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 255 GWh, about what 19,000 average Texas homes use in a year.

Capacity115 MWNameplate, September 2026
Generated255 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2020

Bluebell Solar II in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 133rd largest, about 0.3% of the state's 37 GW of solar capacity.

Sterling County has 6 power plants of 1 MW or more with 1.5 GW in all; Bluebell Solar II is 8% of that and the largest of 2 solar plants there.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Sterling County goes 24 hours a year without power, the 26th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300400202020212022202320242025GWh 255
0100200300400202020212022202320242025255

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Bluebell Solar II (outlined) and other plants in Sterling County, shaded. 31.888, -100.825.

Plant facts

Operator
Bluebell Solar II, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Sterling County, TX
EIA plant ID
63351
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BBS2 Solar Photovoltaic 115 MW 2020 –

Questions

Bluebell Solar II, answered

How much power does Bluebell Solar II produce?

Bluebell Solar II has 115 MW of capacity from one generator. In 2025 it generated 255 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Bluebell Solar II power?

Its 2025 output of 255 GWh equals the yearly electricity use of about 19,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Bluebell Solar II?

Bluebell Solar II is in Sterling County, Texas, at about 31.888°, -100.825°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Sterling County goes 24 hours a year without power, the 26th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Bluebell Solar II?

It is operated by Bluebell Solar II, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Bluebell Solar II open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.