Storage power plant · Brazoria, TX
Bocanova Energy Storage II
Bocanova Energy Storage II is a 150 MW storage power plant in Brazoria County, Texas, operated by Bocanova Power II LLC. Its oldest generator still running came online in 2026.
Bocanova Energy Storage II in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 54th largest, about 0.9% of the state's 16 GW of storage capacity.
Brazoria County has 42 power plants of 1 MW or more with 6.1 GW in all; Bocanova Energy Storage II is 2% of that and the 8th largest of 19 storage plants there.
The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Bocanova Energy Storage II (outlined) and other plants in Brazoria County, shaded. 29.435, -95.251.
Plant facts
- Operator
- Bocanova Power II LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Brazoria County, TX
- EIA plant ID
- 69423
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BCNV2 | Batteries | 150 MW · 300 MWh | 2026 | – |
Questions
Bocanova Energy Storage II, answered
How much can Bocanova Energy Storage II store and deliver?
Bocanova Energy Storage II can deliver up to 150 MW and hold 300 MWh of energy, from one battery or storage system.
Where is Bocanova Energy Storage II?
Bocanova Energy Storage II is in Brazoria County, Texas, at about 29.435°, -95.251°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Bocanova Energy Storage II?
It is operated by Bocanova Power II LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Bocanova Energy Storage II open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.