Natural gas power plant · Brazoria, TX
Oyster Creek Unit VIII
Oyster Creek Unit VIII is a 498 MW natural gas power plant in Brazoria County, Texas, operated by Dow Chemical Company-Oyster Creek VIII. Its oldest generator still running came online in 1994. In 2025 it generated 2.5 TWh, about what 188,000 average Texas homes use in a year.
Oyster Creek Unit VIII in context
Among the 309 natural gas plants in Texas in the EIA's inventory, it is the 72nd largest, about 0.6% of the state's 83 GW of natural gas capacity.
Brazoria County has 42 power plants of 1 MW or more with 6.1 GW in all; Oyster Creek Unit VIII is 8% of that and the 3rd largest of 17 natural gas plants there.
Its capacity factor of 57% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Oyster Creek Unit VIII (outlined) and other plants in Brazoria County, shaded. 28.980, -95.342.
Plant facts
- Operator
- Dow Chemical Company-Oyster Creek VIII
- Sector
- IPP CHP
- Grid operator
- ERCO
- County
- Brazoria County, TX
- EIA plant ID
- 54676
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| G84 | Natural Gas Fired Combined Cycle | 201 MW | 1994 | – |
| G81 | Natural Gas Fired Combined Cycle | 99 MW | 1994 | – |
| G82 | Natural Gas Fired Combined Cycle | 99 MW | 1994 | – |
| G83 | Natural Gas Fired Combined Cycle | 99 MW | 1994 | – |
Questions
Oyster Creek Unit VIII, answered
How much power does Oyster Creek Unit VIII produce?
Oyster Creek Unit VIII has 498 MW of capacity from 4 generators. In 2025 it generated 2.5 TWh, 57% of the most it could have made running flat out all year (its capacity factor).
How many homes does Oyster Creek Unit VIII power?
Its 2025 output of 2.5 TWh equals the yearly electricity use of about 188,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Oyster Creek Unit VIII?
Oyster Creek Unit VIII is in Brazoria County, Texas, at about 28.980°, -95.342°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Oyster Creek Unit VIII?
It is operated by Dow Chemical Company-Oyster Creek VIII (EIA sector: IPP CHP), and it feeds ERCOT, the Texas grid.
When did Oyster Creek Unit VIII open?
Its oldest generator still running came online in 1994.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.