Solar power plant · Brazoria, TX
Brazoria West
Brazoria West is a 200 MW solar power plant in Brazoria County, Texas, operated by Brazoria West Solar Project, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 423 GWh, about what 32,000 average Texas homes use in a year.
Brazoria West in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 82nd largest, about 0.5% of the state's 37 GW of solar capacity.
Brazoria County has 42 power plants of 1 MW or more with 6.1 GW in all; Brazoria West is 3% of that and the largest of 6 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Brazoria West (outlined) and other plants in Brazoria County, shaded. 29.191, -95.663.
Plant facts
- Operator
- Brazoria West Solar Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Brazoria County, TX
- EIA plant ID
- 64447
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | 200 MW | 2022 | – |
Questions
Brazoria West, answered
How much power does Brazoria West produce?
Brazoria West has 200 MW of capacity from one generator. In 2025 it generated 423 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Brazoria West power?
Its 2025 output of 423 GWh equals the yearly electricity use of about 32,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Brazoria West?
Brazoria West is in Brazoria County, Texas, at about 29.191°, -95.663°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Brazoria West?
It is operated by Brazoria West Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Brazoria West open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.