Storage power plant · Brazoria, TX

SMT Ironman Battery Storage Plant

SMT Ironman Battery Storage Plant is a 304 MW storage power plant in Brazoria County, Texas, operated by SMT Ironman BESS LLC. Its oldest generator still running came online in 2025.

Capacity304 MWNameplate, September 2026
Net energy-13.3 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

SMT Ironman Battery Storage Plant in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 3rd largest, about 1.8% of the state's 16 GW of storage capacity.

Brazoria County has 42 power plants of 1 MW or more with 6.1 GW in all; SMT Ironman Battery Storage Plant is 5% of that and the 2nd largest of 19 storage plants there.

The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

SMT Ironman Battery Storage Plant (outlined) and other plants in Brazoria County, shaded. 29.456, -95.310.

Plant facts

Operator
SMT Ironman BESS LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Brazoria County, TX
EIA plant ID
67737
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SMTIR Batteries 304 MW · 441 MWh 2025 –

Questions

SMT Ironman Battery Storage Plant, answered

How much can SMT Ironman Battery Storage Plant store and deliver?

SMT Ironman Battery Storage Plant can deliver up to 304 MW and hold 441 MWh of energy, from one battery or storage system. Its net energy in 2025 was -13.3 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is SMT Ironman Battery Storage Plant?

SMT Ironman Battery Storage Plant is in Brazoria County, Texas, at about 29.456°, -95.310°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.

Who operates SMT Ironman Battery Storage Plant?

It is operated by SMT Ironman BESS LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did SMT Ironman Battery Storage Plant open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.