Storage power plant · Brazoria, TX
SMT Ironman Battery Storage Plant
SMT Ironman Battery Storage Plant is a 304 MW storage power plant in Brazoria County, Texas, operated by SMT Ironman BESS LLC. Its oldest generator still running came online in 2025.
SMT Ironman Battery Storage Plant in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 3rd largest, about 1.8% of the state's 16 GW of storage capacity.
Brazoria County has 42 power plants of 1 MW or more with 6.1 GW in all; SMT Ironman Battery Storage Plant is 5% of that and the 2nd largest of 19 storage plants there.
The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
SMT Ironman Battery Storage Plant (outlined) and other plants in Brazoria County, shaded. 29.456, -95.310.
Plant facts
- Operator
- SMT Ironman BESS LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Brazoria County, TX
- EIA plant ID
- 67737
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SMTIR | Batteries | 304 MW · 441 MWh | 2025 | – |
Questions
SMT Ironman Battery Storage Plant, answered
How much can SMT Ironman Battery Storage Plant store and deliver?
SMT Ironman Battery Storage Plant can deliver up to 304 MW and hold 441 MWh of energy, from one battery or storage system. Its net energy in 2025 was -13.3 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is SMT Ironman Battery Storage Plant?
SMT Ironman Battery Storage Plant is in Brazoria County, Texas, at about 29.456°, -95.310°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Who operates SMT Ironman Battery Storage Plant?
It is operated by SMT Ironman BESS LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did SMT Ironman Battery Storage Plant open?
Its oldest generator still running came online in 2025.