Solar power plant · Brazoria, TX
Brazoria County Solar Project (Danciger)
Brazoria County Solar Project (Danciger) is a 200 MW solar power plant in Brazoria County, Texas, operated by Brazoria County Solar Project, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 423 GWh, about what 32,000 average Texas homes use in a year.
Brazoria County Solar Project (Danciger) in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 87th largest, about 0.5% of the state's 37 GW of solar capacity.
Brazoria County has 42 power plants of 1 MW or more with 6.1 GW in all; Brazoria County Solar Project (Danciger) is 3% of that and the 2nd largest of 6 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Brazoria County Solar Project (Danciger) (outlined) and other plants in Brazoria County, shaded. 29.178, -95.761.
Plant facts
- Operator
- Brazoria County Solar Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Brazoria County, TX
- EIA plant ID
- 66046
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BRZ01 | Solar Photovoltaic | 200 MW | 2022 | – |
Questions
Brazoria County Solar Project (Danciger), answered
How much power does Brazoria County Solar Project (Danciger) produce?
Brazoria County Solar Project (Danciger) has 200 MW of capacity from one generator. In 2025 it generated 423 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Brazoria County Solar Project (Danciger) power?
Its 2025 output of 423 GWh equals the yearly electricity use of about 32,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Brazoria County Solar Project (Danciger)?
Brazoria County Solar Project (Danciger) is in Brazoria County, Texas, at about 29.178°, -95.761°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Brazoria County Solar Project (Danciger)?
It is operated by Brazoria County Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Brazoria County Solar Project (Danciger) open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.