Wind power plant · Cameron, TX
Cameron Wind 1 LLC
Cameron Wind 1 LLC is a 181 MW wind power plant in Cameron County, Texas, operated by Cameron Wind 1 LLC. Its oldest generator still running came online in 2015. In 2025 it generated 348 GWh, about what 26,000 average Texas homes use in a year.
Cameron Wind 1 LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 121st largest, about 0.4% of the state's 45 GW of wind capacity.
Cameron County has 23 power plants of 1 MW or more with 1.6 GW in all; Cameron Wind 1 LLC is 12% of that and the 4th largest of 6 wind plants there.
Its capacity factor of 22% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cameron Wind 1 LLC (outlined) and other plants in Cameron County, shaded. 26.195, -97.466.
Plant facts
- Operator
- Cameron Wind 1 LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Cameron County, TX
- EIA plant ID
- 59118
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CAM1 | Onshore Wind Turbine | 165 MW | 2015 | – |
| SABAL | Batteries | 16 MW · 33 MWh | 2024 | – |
Questions
Cameron Wind 1 LLC, answered
How much power does Cameron Wind 1 LLC produce?
Cameron Wind 1 LLC has 181 MW of capacity from 2 generators. In 2025 it generated 348 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cameron Wind 1 LLC power?
Its 2025 output of 348 GWh equals the yearly electricity use of about 26,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cameron Wind 1 LLC?
Cameron Wind 1 LLC is in Cameron County, Texas, at about 26.195°, -97.466°. It is one of 23 power plants of 1 MW or more in the county. The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Cameron Wind 1 LLC?
It is operated by Cameron Wind 1 LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Cameron Wind 1 LLC open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.