Storage power plant · Cameron, TX

Citrus Flatts Energy Center, LLC

Citrus Flatts Energy Center, LLC is a 100 MW storage power plant in Cameron County, Texas, operated by East Point Energy, LLC. Its oldest generator still running came online in 2023.

Capacity100 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2023

Citrus Flatts Energy Center, LLC in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 84th largest, about 0.6% of the state's 16 GW of storage capacity.

Cameron County has 23 power plants of 1 MW or more with 1.6 GW in all; Citrus Flatts Energy Center, LLC is 6% of that and the largest of 9 storage plants there.

The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Citrus Flatts Energy Center, LLC (outlined) and other plants in Cameron County, shaded. 26.191, -97.696.

Plant facts

Operator
East Point Energy, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Cameron County, TX
EIA plant ID
69352
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CFBA1 Batteries 100 MW · 200 MWh 2023 –

Questions

Citrus Flatts Energy Center, LLC, answered

How much can Citrus Flatts Energy Center, LLC store and deliver?

Citrus Flatts Energy Center, LLC can deliver up to 100 MW and hold 200 MWh of energy, from one battery or storage system.

Where is Citrus Flatts Energy Center, LLC?

Citrus Flatts Energy Center, LLC is in Cameron County, Texas, at about 26.191°, -97.696°. It is one of 23 power plants of 1 MW or more in the county. The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Citrus Flatts Energy Center, LLC?

It is operated by East Point Energy, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Citrus Flatts Energy Center, LLC open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.