Storage power plant · Hidalgo, TX

Carambola BESS

Carambola BESS is a 98 MW storage power plant in Hidalgo County, Texas, operated by Carambola BESS LLC. Its oldest generator still running came online in 2026.

Capacity98 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Carambola BESS in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 85th largest, about 0.6% of the state's 16 GW of storage capacity.

Hidalgo County has 30 power plants of 1 MW or more with 3.4 GW in all; Carambola BESS is 3% of that and the 5th largest of 16 storage plants there.

The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Carambola BESS (outlined) and other plants in Hidalgo County, shaded. 26.250, -98.239.

Plant facts

Operator
Carambola BESS LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Hidalgo County, TX
EIA plant ID
69168
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CRBLA Batteries 98 MW · 197 MWh 2026 –

Questions

Carambola BESS, answered

How much can Carambola BESS store and deliver?

Carambola BESS can deliver up to 98 MW and hold 197 MWh of energy, from one battery or storage system.

Where is Carambola BESS?

Carambola BESS is in Hidalgo County, Texas, at about 26.250°, -98.239°. It is one of 30 power plants of 1 MW or more in the county. The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Carambola BESS?

It is operated by Carambola BESS LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Carambola BESS open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.