Castle Gap Wind is a 197 MW wind power plant in Mills County, Texas, operated by Castle Gap Wind Power, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 633 GWh, about what 47,000 average Texas homes use in a year.
Castle Gap Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 112th largest, about 0.4% of the state's 45 GW of wind capacity.
Mills County has 4 power plants of 1 MW or more with 849 MW in all; Castle Gap Wind is 23% of that and the 3rd largest of 4 wind plants there.
Its capacity factor of 37% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Mills County goes 1.8 hours a year without power, the 232nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Castle Gap Wind (outlined) and other plants in Mills County, shaded. 31.394, -98.359.
Plant facts
- Operator
- Castle Gap Wind Power, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Mills County, TX
- EIA plant ID
- 65790
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CGWIN | Onshore Wind Turbine | 197 MW | 2023 | – |
Nearby
Other plants in Mills County
Questions
Castle Gap Wind, answered
How much power does Castle Gap Wind produce?
Castle Gap Wind has 197 MW of capacity from one generator. In 2025 it generated 633 GWh, 37% of the most it could have made running flat out all year (its capacity factor).
How many homes does Castle Gap Wind power?
Its 2025 output of 633 GWh equals the yearly electricity use of about 47,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Castle Gap Wind?
Castle Gap Wind is in Mills County, Texas, at about 31.394°, -98.359°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Mills County goes 1.8 hours a year without power, the 232nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Castle Gap Wind?
It is operated by Castle Gap Wind Power, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Castle Gap Wind open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.