Wind power plant · Mills, TX

Flat Top Wind I

Flat Top Wind I is a 200 MW wind power plant in Mills County, Texas, operated by BHE Renewables, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 787 GWh, about what 59,000 average Texas homes use in a year.

Capacity200 MWNameplate, September 2026
Generated787 GWhIn 2025
Capacity factor45%Share of the most it could make, 2025
Generators1Oldest from 2018

Flat Top Wind I in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 108th largest, about 0.4% of the state's 45 GW of wind capacity.

Mills County has 4 power plants of 1 MW or more with 849 MW in all; Flat Top Wind I is 24% of that and the 2nd largest of 4 wind plants there.

Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Mills County goes 1.8 hours a year without power, the 232nd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,00020182019202020212022202320242025GWh 787
02004006008001,0002019202120232025787

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Flat Top Wind I (outlined) and other plants in Mills County, shaded. 31.685, -98.603.

Plant facts

Operator
BHE Renewables, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Mills County, TX
EIA plant ID
61212
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
FTWI Onshore Wind Turbine 200 MW 2018 –

Questions

Flat Top Wind I, answered

How much power does Flat Top Wind I produce?

Flat Top Wind I has 200 MW of capacity from one generator. In 2025 it generated 787 GWh, 45% of the most it could have made running flat out all year (its capacity factor).

How many homes does Flat Top Wind I power?

Its 2025 output of 787 GWh equals the yearly electricity use of about 59,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Flat Top Wind I?

Flat Top Wind I is in Mills County, Texas, at about 31.685°, -98.603°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Mills County goes 1.8 hours a year without power, the 232nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Flat Top Wind I?

It is operated by BHE Renewables, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Flat Top Wind I open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.