Wind power plant · Mills, TX
Priddy Wind Project
Priddy Wind Project is a 302 MW wind power plant in Mills County, Texas, operated by Engie North America. Its oldest generator still running came online in 2022. In 2025 it generated 1.0 TWh, about what 76,000 average Texas homes use in a year.
Priddy Wind Project in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 23rd largest, about 0.7% of the state's 45 GW of wind capacity.
Mills County has 4 power plants of 1 MW or more with 849 MW in all; Priddy Wind Project is 36% of that and the largest of 4 wind plants there.
Its capacity factor of 38% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Mills County goes 1.8 hours a year without power, the 232nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Priddy Wind Project (outlined) and other plants in Mills County, shaded. 31.548, -98.495.
Plant facts
- Operator
- Engie North America
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Mills County, TX
- EIA plant ID
- 64165
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WTG1 | Onshore Wind Turbine | 302 MW | 2022 | – |
Nearby
Other plants in Mills County
Questions
Priddy Wind Project, answered
How much power does Priddy Wind Project produce?
Priddy Wind Project has 302 MW of capacity from one generator. In 2025 it generated 1.0 TWh, 38% of the most it could have made running flat out all year (its capacity factor).
How many homes does Priddy Wind Project power?
Its 2025 output of 1.0 TWh equals the yearly electricity use of about 76,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Priddy Wind Project?
Priddy Wind Project is in Mills County, Texas, at about 31.548°, -98.495°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Mills County goes 1.8 hours a year without power, the 232nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Priddy Wind Project?
It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Priddy Wind Project open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.