Wind power plant · Webb, TX
Cedro Hill Wind LLC
Cedro Hill Wind LLC is a 300 MW wind power plant in Webb County, Texas, operated by Cedro Hill Wind, LLC. Its oldest generator still running came online in 2010. In 2025 it generated 567 GWh, about what 43,000 average Texas homes use in a year.
Cedro Hill Wind LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 27th largest, about 0.7% of the state's 45 GW of wind capacity.
Webb County has 15 power plants of 1 MW or more with 2.6 GW in all; Cedro Hill Wind LLC is 11% of that and the largest of 5 wind plants there.
Its capacity factor of 22% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cedro Hill Wind LLC (outlined) and other plants in Webb County, shaded. 27.576, -98.905.
Plant facts
- Operator
- Cedro Hill Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Webb County, TX
- EIA plant ID
- 57260
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 150 MW | 2010 | – |
| 2 | Onshore Wind Turbine | 150 MW | 2010 | – |
Questions
Cedro Hill Wind LLC, answered
How much power does Cedro Hill Wind LLC produce?
Cedro Hill Wind LLC has 300 MW of capacity from 2 generators. In 2025 it generated 567 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cedro Hill Wind LLC power?
Its 2025 output of 567 GWh equals the yearly electricity use of about 43,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cedro Hill Wind LLC?
Cedro Hill Wind LLC is in Webb County, Texas, at about 27.576°, -98.905°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Cedro Hill Wind LLC?
It is operated by Cedro Hill Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Cedro Hill Wind LLC open?
Its oldest generator still running came online in 2010.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.