Guajillo Energy Storage is a 229 MW storage power plant in Webb County, Texas, operated by Guajillo Energy Storage, LLC. Its oldest generator still running came online in 2025.

Capacity229 MWNameplate, September 2026
Net energy-1.6 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Guajillo Energy Storage in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 12th largest, about 1.4% of the state's 16 GW of storage capacity.

Webb County has 15 power plants of 1 MW or more with 2.6 GW in all; Guajillo Energy Storage is 9% of that and the largest of 3 storage plants there.

The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Guajillo Energy Storage (outlined) and other plants in Webb County, shaded. 27.629, -99.266.

Plant facts

Operator
Guajillo Energy Storage, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Webb County, TX
EIA plant ID
68613
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GUAJ1 Batteries 229 MW · 229 MWh 2025 –

Questions

Guajillo Energy Storage, answered

How much can Guajillo Energy Storage store and deliver?

Guajillo Energy Storage can deliver up to 229 MW and hold 229 MWh of energy, from one battery or storage system. Its net energy in 2025 was -1.6 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Guajillo Energy Storage?

Guajillo Energy Storage is in Webb County, Texas, at about 27.629°, -99.266°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Guajillo Energy Storage?

It is operated by Guajillo Energy Storage, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Guajillo Energy Storage open?

Its oldest generator still running came online in 2025.