Solar power plant · Webb, TX
Hecate Energy Outpost Solar LLC
Hecate Energy Outpost Solar LLC is a 515 MW solar power plant in Webb County, Texas, operated by Repsol Renewables NA. Its oldest generator still running came online in 2025. In 2025 it generated 519 GWh, about what 39,000 average Texas homes use in a year.
Hecate Energy Outpost Solar LLC in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 4th largest, about 1.4% of the state's 37 GW of solar capacity.
Webb County has 15 power plants of 1 MW or more with 2.6 GW in all; Hecate Energy Outpost Solar LLC is 20% of that and the largest of 3 solar plants there.
The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Hecate Energy Outpost Solar LLC (outlined) and other plants in Webb County, shaded. 27.859, -99.162.
Plant facts
- Operator
- Repsol Renewables NA
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Webb County, TX
- EIA plant ID
- 68838
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| RROS | Solar Photovoltaic | 515 MW | 2025 | – |
Questions
Hecate Energy Outpost Solar LLC, answered
How much power does Hecate Energy Outpost Solar LLC produce?
Hecate Energy Outpost Solar LLC has 515 MW of capacity from one generator. In 2025 it generated 519 GWh.
How many homes does Hecate Energy Outpost Solar LLC power?
Its 2025 output of 519 GWh equals the yearly electricity use of about 39,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hecate Energy Outpost Solar LLC?
Hecate Energy Outpost Solar LLC is in Webb County, Texas, at about 27.859°, -99.162°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in Webb County goes 5.0 hours a year without power, the 199th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Hecate Energy Outpost Solar LLC?
It is operated by Repsol Renewables NA (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Hecate Energy Outpost Solar LLC open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.