Solar power plant · Crane, TX
Crane Solar Project
Crane Solar Project is a 150 MW solar power plant in Crane County, Texas, operated by Crane Solar Project, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 406 GWh, about what 30,000 average Texas homes use in a year.
Crane Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 112th largest, about 0.4% of the state's 37 GW of solar capacity.
Crane County has 4 power plants of 1 MW or more with 703 MW in all; Crane Solar Project is 21% of that.
Its capacity factor of 31% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Crane County goes 8.2 hours a year without power, the 138th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Crane Solar Project (outlined) and other plants in Crane County, shaded. 31.254, -102.312.
Plant facts
- Operator
- Crane Solar Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Crane County, TX
- EIA plant ID
- 63519
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CRN1 | Solar Photovoltaic | 150 MW | 2020 | – |
Nearby
Other plants in Crane County
Questions
Crane Solar Project, answered
How much power does Crane Solar Project produce?
Crane Solar Project has 150 MW of capacity from one generator. In 2025 it generated 406 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Crane Solar Project power?
Its 2025 output of 406 GWh equals the yearly electricity use of about 30,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Crane Solar Project?
Crane Solar Project is in Crane County, Texas, at about 31.254°, -102.312°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Crane County goes 8.2 hours a year without power, the 138th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Crane Solar Project?
It is operated by Crane Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Crane Solar Project open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.