Storage power plant · Crane, TX

Crossett Power Management LLC

Crossett Power Management LLC is a 203 MW storage power plant in Crane County, Texas, operated by Crossett Power Management LLC. Its oldest generator still running came online in 2022.

Capacity203 MWNameplate, September 2026
Net energy-10.9 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2022

Crossett Power Management LLC in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 17th largest, about 1.2% of the state's 16 GW of storage capacity.

Crane County has 4 power plants of 1 MW or more with 703 MW in all; Crossett Power Management LLC is 29% of that and the largest of 3 storage plants there.

The average electricity customer in Crane County goes 8.2 hours a year without power, the 138th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.

0001111202320242025GWh -11
0001111202320242025-11

Where it is

Crossett Power Management LLC (outlined) and other plants in Crane County, shaded. 31.192, -102.317.

Plant facts

Operator
Crossett Power Management LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Crane County, TX
EIA plant ID
66009
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BA Batteries 203 MW · 400 MWh 2022 –

Questions

Crossett Power Management LLC, answered

How much can Crossett Power Management LLC store and deliver?

Crossett Power Management LLC can deliver up to 203 MW and hold 400 MWh of energy, from one battery or storage system. Its net energy in 2025 was -10.9 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Crossett Power Management LLC?

Crossett Power Management LLC is in Crane County, Texas, at about 31.192°, -102.317°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Crane County goes 8.2 hours a year without power, the 138th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Crossett Power Management LLC?

It is operated by Crossett Power Management LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Crossett Power Management LLC open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Methodology.