Storage power plant · Crane, TX

Mendoza Trail BESS

Mendoza Trail BESS is a 200 MW storage power plant in Crane County, Texas, operated by Lydian Energy. Its oldest generator still running came online in 2026.

Capacity200 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Mendoza Trail BESS in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 27th largest, about 1.2% of the state's 16 GW of storage capacity.

Crane County has 4 power plants of 1 MW or more with 703 MW in all; Mendoza Trail BESS is 28% of that and the 2nd largest of 3 storage plants there.

The average electricity customer in Crane County goes 8.2 hours a year without power, the 138th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Mendoza Trail BESS (outlined) and other plants in Crane County, shaded. 31.194, -102.316.

Plant facts

Operator
Lydian Energy
Sector
IPP Non-CHP
Grid operator
ERCO
County
Crane County, TX
EIA plant ID
68581
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MTB Batteries 200 MW · 400 MWh 2026 –

Questions

Mendoza Trail BESS, answered

How much can Mendoza Trail BESS store and deliver?

Mendoza Trail BESS can deliver up to 200 MW and hold 400 MWh of energy, from one battery or storage system.

Where is Mendoza Trail BESS?

Mendoza Trail BESS is in Crane County, Texas, at about 31.194°, -102.316°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Crane County goes 8.2 hours a year without power, the 138th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Mendoza Trail BESS?

It is operated by Lydian Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Mendoza Trail BESS open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.