Solar power plant · Halifax, VA

Crystal Hill Solar

Crystal Hill Solar is a 65 MW solar power plant in Halifax County, Virginia, operated by Urban Grid Solar. Its oldest generator still running came online in 2023. In 2025 it generated 129 GWh, about what 10,000 average Virginia homes use in a year.

Capacity65 MWNameplate, September 2026
Generated129 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2023

Crystal Hill Solar in context

Among the 144 solar plants in Virginia in the EIA's inventory, it is the 35th largest, about 1.2% of the state's 5.3 GW of solar capacity.

Halifax County has 12 power plants of 1 MW or more with 1.4 GW in all; Crystal Hill Solar is 5% of that and the 6th largest of 9 solar plants there.

Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Halifax County goes 20 hours a year without power, the 41st most of 123 counties in Virginia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150202320242025GWh 129
050100150202320242025129

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Crystal Hill Solar (outlined) and other plants in Halifax County, shaded. 36.840, -78.938.

Plant facts

Operator
Urban Grid Solar
Sector
IPP Non-CHP
Grid operator
PJM
County
Halifax County, VA
EIA plant ID
66839
Where Virginia's power comes from → Virginia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CRYH1 Solar Photovoltaic 65 MW 2023 –

Questions

Crystal Hill Solar, answered

How much power does Crystal Hill Solar produce?

Crystal Hill Solar has 65 MW of capacity from one generator. In 2025 it generated 129 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Crystal Hill Solar power?

Its 2025 output of 129 GWh equals the yearly electricity use of about 10,000 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Crystal Hill Solar?

Crystal Hill Solar is in Halifax County, Virginia, at about 36.840°, -78.938°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Halifax County goes 20 hours a year without power, the 41st most of 123 counties in Virginia. The county's page has the full outage record.

Who operates Crystal Hill Solar?

It is operated by Urban Grid Solar (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Crystal Hill Solar open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.