Solar power plant · Halifax, VA

Sunnybrook Solar Project - Hybrid

Sunnybrook Solar Project - Hybrid is a 51 MW solar power plant in Halifax County, Virginia, operated by Sunnybrook Farm Solar, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 90 GWh, about what 7,000 average Virginia homes use in a year.

Capacity51 MWNameplate, September 2026
Generated90 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators1Oldest from 2022

Sunnybrook Solar Project - Hybrid in context

Among the 144 solar plants in Virginia in the EIA's inventory, it is the 39th largest, about 1.0% of the state's 5.3 GW of solar capacity.

Halifax County has 12 power plants of 1 MW or more with 1.4 GW in all; Sunnybrook Solar Project - Hybrid is 4% of that and the 7th largest of 9 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Halifax County goes 20 hours a year without power, the 41st most of 123 counties in Virginia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0204060801002022202320242025GWh 90
020406080100202220232024202590

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Sunnybrook Solar Project - Hybrid (outlined) and other plants in Halifax County, shaded. 36.799, -78.840.

Plant facts

Operator
Sunnybrook Farm Solar, LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Halifax County, VA
EIA plant ID
65307
Where Virginia's power comes from → Virginia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SUNS Solar Photovoltaic 51 MW 2022 –

Planned

GeneratorTechnologyCapacityExpected
SUNBBatteries13 MW2027

Questions

Sunnybrook Solar Project - Hybrid, answered

How much power does Sunnybrook Solar Project - Hybrid produce?

Sunnybrook Solar Project - Hybrid has 51 MW of capacity from one generator. In 2025 it generated 90 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Sunnybrook Solar Project - Hybrid power?

Its 2025 output of 90 GWh equals the yearly electricity use of about 7,000 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Sunnybrook Solar Project - Hybrid?

Sunnybrook Solar Project - Hybrid is in Halifax County, Virginia, at about 36.799°, -78.840°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Halifax County goes 20 hours a year without power, the 41st most of 123 counties in Virginia. The county's page has the full outage record.

Who operates Sunnybrook Solar Project - Hybrid?

It is operated by Sunnybrook Farm Solar, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Sunnybrook Solar Project - Hybrid open?

Its oldest generator still running came online in 2022. 1 more generator is planned.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.