Biomass power plant · Halifax, VA

Halifax County Biomass

Halifax County Biomass is a 50 MW biomass power plant in Halifax County, Virginia, operated by South Boston Energy LLC. Its oldest generator still running came online in 2013. In 2025 it generated 359 GWh, about what 28,000 average Virginia homes use in a year.

Capacity50 MWNameplate, September 2026
Generated359 GWhIn 2025
Capacity factor82%Share of the most it could make, 2025
Generators1Oldest from 2013

Halifax County Biomass in context

Among the 55 other-fuel plants in Virginia in the EIA's inventory, it is the 11th largest, about 2.9% of the state's 1.7 GW of other-fuel capacity.

Halifax County has 12 power plants of 1 MW or more with 1.4 GW in all; Halifax County Biomass is 3% of that.

Its capacity factor of 82% in 2025 is higher than the 25% typical for biomass plants across the US.

The average electricity customer in Halifax County goes 20 hours a year without power, the 41st most of 123 counties in Virginia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020182019202020212022202320242025GWh 359
01002003004002019202120232025359

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Halifax County Biomass (outlined) and other plants in Halifax County, shaded. 36.701, -78.873.

Plant facts

Operator
South Boston Energy LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Halifax County, VA
EIA plant ID
58560
Where Virginia's power comes from → Virginia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
STG1 Wood/Wood Waste Biomass 50 MW 2013 –

Questions

Halifax County Biomass, answered

How much power does Halifax County Biomass produce?

Halifax County Biomass has 50 MW of capacity from one generator. In 2025 it generated 359 GWh, 82% of the most it could have made running flat out all year (its capacity factor).

How many homes does Halifax County Biomass power?

Its 2025 output of 359 GWh equals the yearly electricity use of about 28,000 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Halifax County Biomass?

Halifax County Biomass is in Halifax County, Virginia, at about 36.701°, -78.873°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Halifax County goes 20 hours a year without power, the 41st most of 123 counties in Virginia. The county's page has the full outage record.

Who operates Halifax County Biomass?

It is operated by South Boston Energy LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Halifax County Biomass open?

Its oldest generator still running came online in 2013.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.