Oil power plant · Volusia, FL

DeBary

DeBary is a 748 MW oil power plant in Volusia County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 1975. In 2025 it generated 104 GWh, about what 7,800 average Florida homes use in a year.

Capacity748 MWNameplate, September 2026
Generated104 GWhIn 2025
Capacity factor2%Share of the most it could make, 2025
Generators9Oldest from 1975

DeBary in context

Among the 40 other-fuel plants in Florida in the EIA's inventory, it is the largest, about 28% of the state's 2.6 GW of other-fuel capacity.

Volusia County has 6 power plants of 1 MW or more with 3.3 GW in all; DeBary is 23% of that and the largest of 2 oil plants there.

Its capacity factor of 2% in 2025 is lower than the 25% typical for oil plants across the US.

The average electricity customer in Volusia County goes 16 hours a year without power, the 23rd most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 104
0501001502002019202120232025104

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

DeBary (outlined) and other plants in Volusia County, shaded. 28.904, -81.332.

Plant facts

Operator
Duke Energy Florida, LLC
Sector
Electric Utility
Grid operator
FPC
County
Volusia County, FL
EIA plant ID
6046
  • Other438 MW58%
  • Natural gas311 MW42%
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
10 Petroleum Liquids 104 MW 1992 –
7 Natural Gas Fired Combustion Turbine 104 MW 1992 –
8 Natural Gas Fired Combustion Turbine 104 MW 1992 –
9 Natural Gas Fired Combustion Turbine 104 MW 1992 –
3 Petroleum Liquids 67 MW 1975 2034
5 Petroleum Liquids 67 MW 1975 2034
2 Petroleum Liquids 67 MW 1976 2034
4 Petroleum Liquids 67 MW 1976 2034
6 Petroleum Liquids 67 MW 1976 2034

Retired

GeneratorTechnologyCapacityOnlineRetired
P1Petroleum Liquids67 MW19762016

Nearby

Other plants in Volusia County

Questions

DeBary, answered

How much power does DeBary produce?

DeBary has 748 MW of capacity from 9 generators. In 2025 it generated 104 GWh, 2% of the most it could have made running flat out all year (its capacity factor).

How many homes does DeBary power?

Its 2025 output of 104 GWh equals the yearly electricity use of about 7,800 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is DeBary?

DeBary is in Volusia County, Florida, at about 28.904°, -81.332°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Volusia County goes 16 hours a year without power, the 23rd most of 67 counties in Florida. The county's page has the full outage record.

Who operates DeBary?

It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.

When did DeBary open?

Its oldest generator still running came online in 1975. Planned retirements are scheduled for 2034.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.