Oil power plant · Volusia, FL
DeBary
DeBary is a 748 MW oil power plant in Volusia County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 1975. In 2025 it generated 104 GWh, about what 7,800 average Florida homes use in a year.
DeBary in context
Among the 40 other-fuel plants in Florida in the EIA's inventory, it is the largest, about 28% of the state's 2.6 GW of other-fuel capacity.
Volusia County has 6 power plants of 1 MW or more with 3.3 GW in all; DeBary is 23% of that and the largest of 2 oil plants there.
Its capacity factor of 2% in 2025 is lower than the 25% typical for oil plants across the US.
The average electricity customer in Volusia County goes 16 hours a year without power, the 23rd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
DeBary (outlined) and other plants in Volusia County, shaded. 28.904, -81.332.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Volusia County, FL
- EIA plant ID
- 6046
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 10 | Petroleum Liquids | 104 MW | 1992 | – |
| 7 | Natural Gas Fired Combustion Turbine | 104 MW | 1992 | – |
| 8 | Natural Gas Fired Combustion Turbine | 104 MW | 1992 | – |
| 9 | Natural Gas Fired Combustion Turbine | 104 MW | 1992 | – |
| 3 | Petroleum Liquids | 67 MW | 1975 | 2034 |
| 5 | Petroleum Liquids | 67 MW | 1975 | 2034 |
| 2 | Petroleum Liquids | 67 MW | 1976 | 2034 |
| 4 | Petroleum Liquids | 67 MW | 1976 | 2034 |
| 6 | Petroleum Liquids | 67 MW | 1976 | 2034 |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| P1 | Petroleum Liquids | 67 MW | 1976 | 2016 |
Nearby
Other plants in Volusia County
Questions
DeBary, answered
How much power does DeBary produce?
DeBary has 748 MW of capacity from 9 generators. In 2025 it generated 104 GWh, 2% of the most it could have made running flat out all year (its capacity factor).
How many homes does DeBary power?
Its 2025 output of 104 GWh equals the yearly electricity use of about 7,800 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is DeBary?
DeBary is in Volusia County, Florida, at about 28.904°, -81.332°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Volusia County goes 16 hours a year without power, the 23rd most of 67 counties in Florida. The county's page has the full outage record.
Who operates DeBary?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did DeBary open?
Its oldest generator still running came online in 1975. Planned retirements are scheduled for 2034.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.