Solar power plant · Volusia, FL

Pioneer Trail Solar Energy Center

Pioneer Trail Solar Energy Center is a 75 MW solar power plant in Volusia County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2019. In 2025 it generated 129 GWh, about what 9,700 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated129 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators1Oldest from 2019

Pioneer Trail Solar Energy Center in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 50th largest, about 0.5% of the state's 14 GW of solar capacity.

Volusia County has 6 power plants of 1 MW or more with 3.3 GW in all; Pioneer Trail Solar Energy Center is 2% of that and the largest of 3 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Volusia County goes 16 hours a year without power, the 23rd most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0501001502002019202020212022202320242025GWh 129
0501001502002019202120232025129

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Pioneer Trail Solar Energy Center (outlined) and other plants in Volusia County, shaded. 29.080, -81.100.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
Volusia County, FL
EIA plant ID
61767
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2019 –

Nearby

Other plants in Volusia County

Questions

Pioneer Trail Solar Energy Center, answered

How much power does Pioneer Trail Solar Energy Center produce?

Pioneer Trail Solar Energy Center has 75 MW of capacity from one generator. In 2025 it generated 129 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Pioneer Trail Solar Energy Center power?

Its 2025 output of 129 GWh equals the yearly electricity use of about 9,700 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Pioneer Trail Solar Energy Center?

Pioneer Trail Solar Energy Center is in Volusia County, Florida, at about 29.080°, -81.100°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Volusia County goes 16 hours a year without power, the 23rd most of 67 counties in Florida. The county's page has the full outage record.

Who operates Pioneer Trail Solar Energy Center?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Pioneer Trail Solar Energy Center open?

Its oldest generator still running came online in 2019.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.