Hydro power plant · Berkshire, MA

Deerfield 5

Deerfield 5 is a 18 MW hydro power plant in Berkshire County, Massachusetts, operated by Great River Hydro, LLC. Its oldest generator still running came online in 1974. In 2025 it generated 44 GWh, about what 6,200 average Massachusetts homes use in a year.

Capacity18 MWNameplate, September 2026
Generated44 GWhIn 2025
Capacity factor29%Share of the most it could make, 2025
Generators1Oldest from 1974

Deerfield 5 in context

Among the 30 hydro plants in Massachusetts in the EIA's inventory, it is the 5th largest, about 6.5% of the state's 271 MW of hydro capacity.

Berkshire County has 42 power plants of 1 MW or more with 1.0 GW in all; Deerfield 5 is 2% of that and the largest of 3 hydro plants there.

Its capacity factor of 29% in 2025 is lower than the 34% typical for hydro plants across the US.

The average electricity customer in Berkshire County goes 3.3 hours a year without power, the 12th most of 14 counties in Massachusetts. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608020182019202020212022202320242025GWh 44
020406080201920212023202544

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Deerfield 5 (outlined) and other plants in Berkshire County, shaded. 42.691, -72.956.

Plant facts

Operator
Great River Hydro, LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
Berkshire County, MA
EIA plant ID
1620
Where Massachusetts's power comes from → Massachusetts power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Conventional Hydroelectric 18 MW 1974 –

Nearby

Other plants in Berkshire County

Questions

Deerfield 5, answered

How much power does Deerfield 5 produce?

Deerfield 5 has 18 MW of capacity from one generator. In 2025 it generated 44 GWh, 29% of the most it could have made running flat out all year (its capacity factor).

How many homes does Deerfield 5 power?

Its 2025 output of 44 GWh equals the yearly electricity use of about 6,200 average Massachusetts homes (596 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Deerfield 5?

Deerfield 5 is in Berkshire County, Massachusetts, at about 42.691°, -72.956°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Berkshire County goes 3.3 hours a year without power, the 12th most of 14 counties in Massachusetts. The county's page has the full outage record.

Who operates Deerfield 5?

It is operated by Great River Hydro, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did Deerfield 5 open?

Its oldest generator still running came online in 1974.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Massachusetts home's 596 kWh a month in 2025. Methodology.