Solar power plant · Limestone, TX

Diver Solar, LLC

Diver Solar, LLC is a 225 MW solar power plant in Limestone County, Texas, operated by Diver Solar, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 177 GWh, about what 13,000 average Texas homes use in a year.

Capacity225 MWNameplate, September 2026
Generated177 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Diver Solar, LLC in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 67th largest, about 0.6% of the state's 37 GW of solar capacity.

Limestone County has 7 power plants of 1 MW or more with 3.1 GW in all; Diver Solar, LLC is 7% of that and the 2nd largest of 4 solar plants there.

The average electricity customer in Limestone County goes 15 hours a year without power, the 71st most of 240 counties in Texas. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Diver Solar, LLC (outlined) and other plants in Limestone County, shaded. 31.250, -96.390.

Plant facts

Operator
Diver Solar, LLC
Sector
Industrial Non-CHP
Grid operator
ERCO
County
Limestone County, TX
EIA plant ID
68483
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
5665 Solar Photovoltaic 225 MW 2025 –

Nearby

Other plants in Limestone County

Questions

Diver Solar, LLC, answered

How much power does Diver Solar, LLC produce?

Diver Solar, LLC has 225 MW of capacity from one generator. In 2025 it generated 177 GWh.

How many homes does Diver Solar, LLC power?

Its 2025 output of 177 GWh equals the yearly electricity use of about 13,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Diver Solar, LLC?

Diver Solar, LLC is in Limestone County, Texas, at about 31.250°, -96.390°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Limestone County goes 15 hours a year without power, the 71st most of 240 counties in Texas. The county's page has the full outage record.

Who operates Diver Solar, LLC?

It is operated by Diver Solar, LLC (EIA sector: Industrial Non-CHP), and it feeds ERCOT, the Texas grid.

When did Diver Solar, LLC open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.