Solar power plant · Limestone, TX
Waco Solar
Waco Solar is a 400 MW solar power plant in Limestone County, Texas, operated by Waco Solar, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 911 GWh, about what 68,000 average Texas homes use in a year.
Waco Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 21st largest, about 1.1% of the state's 37 GW of solar capacity.
Limestone County has 7 power plants of 1 MW or more with 3.1 GW in all; Waco Solar is 13% of that and the largest of 4 solar plants there.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Limestone County goes 15 hours a year without power, the 71st most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Waco Solar (outlined) and other plants in Limestone County, shaded. 31.710, -96.819.
Plant facts
- Operator
- Waco Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Limestone County, TX
- EIA plant ID
- 65762
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SWACO | Solar Photovoltaic | 400 MW | 2024 | – |
Nearby
Other plants in Limestone County
Questions
Waco Solar, answered
How much power does Waco Solar produce?
Waco Solar has 400 MW of capacity from one generator. In 2025 it generated 911 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Waco Solar power?
Its 2025 output of 911 GWh equals the yearly electricity use of about 68,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Waco Solar?
Waco Solar is in Limestone County, Texas, at about 31.710°, -96.819°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Limestone County goes 15 hours a year without power, the 71st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Waco Solar?
It is operated by Waco Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Waco Solar open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.