Wind power plant · Limestone, TX
Hubbard Wind
Hubbard Wind is a 300 MW wind power plant in Limestone County, Texas, operated by Hubbard Wind LLC. Its oldest generator still running came online in 2021. In 2025 it generated 956 GWh, about what 72,000 average Texas homes use in a year.
Hubbard Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 34th largest, about 0.7% of the state's 45 GW of wind capacity.
Limestone County has 7 power plants of 1 MW or more with 3.1 GW in all; Hubbard Wind is 10% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Limestone County goes 15 hours a year without power, the 71st most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hubbard Wind (outlined) and other plants in Limestone County, shaded. 31.775, -96.828.
Plant facts
- Operator
- Hubbard Wind LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Limestone County, TX
- EIA plant ID
- 65048
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HW001 | Onshore Wind Turbine | 300 MW | 2021 | – |
Nearby
Other plants in Limestone County
Questions
Hubbard Wind, answered
How much power does Hubbard Wind produce?
Hubbard Wind has 300 MW of capacity from one generator. In 2025 it generated 956 GWh, 36% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hubbard Wind power?
Its 2025 output of 956 GWh equals the yearly electricity use of about 72,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hubbard Wind?
Hubbard Wind is in Limestone County, Texas, at about 31.775°, -96.828°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Limestone County goes 15 hours a year without power, the 71st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Hubbard Wind?
It is operated by Hubbard Wind LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Hubbard Wind open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.